IGATEC GmbH is your competent partner for design, construction, delivery, installation and maintenance of turnkey loading facilities.

We manufacture loading plants tailored to the specific needs and the required daily or annual performance for loading and unloading of …

  • Rail tank cars
  • Road tanker/ tanktainers
  • Ships
  • Airplanes
  • Helicopters

 

IGATEC loading facilities are equipped with the appropriate loading systems, such as:

IGATEC - Verladesysteme

  • Top loading systems
  • Bottom loading systems
  • On Spot loading systems
  • New On Spot loading systems
  • TOP SPOT® loading systems
  • Loading skids
                             

 

and the necessary peripheral systems, such as:

IGATEC - Peripheriesysteme

  • Piping systems
  • Vapor recovery units      
  • Pump stations
  • Marshalling yards
  • Operator buildings
                                       

 

They serve for the safe transfer of liquid and gaseous fluids, such as:

  • Light petrochemicals
            Petrol, diesel, kerosene (JET A-1)…
  • Dark petrochemicals
            Crude oil, bitumen, lube oils, fuel oils, black oils…
  • Stable gas condensates
  • Liquid gases
            LPG, LNG, chlorine…
  • Biodiesel / bioethanol
  • Nearly all other chemical products
            Acids, alkalis…

 

IGATEC Services at a Glance:

  • Conception
  • Engineering
  • Project management
  • Procurement, manufacturing and delivery of components
  • Set-up / assembling
  • Initial start-up
  • Training
  • After sales service

LPG Loading Facility

Further Realized Projects

IGATEC - Verladeanlagen
Loading Facility Surgut

IGATEC - Verladeanlagen
Loading Facility Angarsk

IGATEC - Verladeanlagen
Helicopter Refuelling Station
Oberjettenberg

IGATEC - Verladeanlagen
Loading Facility Uchta

Project Kalusch - Unloading of liquified petroleum gas (LPG)

Project description
Unloading station for multiplex fraction of light hydrocarbons
Loading capacity of the plant: 900 tons per day
Following services are included in our scope of the project:

  • Basic und detail engineering
  • Supply of the equipment and devices
    -  18 Top Unloading systems for the unloading of
        liquid gas (LPG) out of rail tank wagons
    -  1 screw compressor
    -  1 evaporator and superheater
    -  Process engineering
    -  Automation system
    -  Supply of the EMC / I&C technique
    -  Fire-fighting and alert system

Projeсt Astrachan - Loading of 5 sorts of gasoline / petrol and diesel

Project description
TURN KEY - Project
Loading capacity of the plant: 2,5 Mio. tons per year
Following services are included in our scope of the project:

  • Basic- and detail engineering
  • Supply of the equipment and devices
    -  4 pieces TOP SPOT®-loading systems for the loading of 5 sorts of
       petrol/gasoline and diesel into rail tank wagon
    -  Steel- + pipeline construction
    -  Automation system
    -  Fire-fighting system
    -  Composite/Combined weighing systems
    -  Cable switching/shunting unit for 2 x 30 rail tank wagons
    -  Pump station
    -  Operator building
    -  VRU (Vapour Recovery/Recycling Unit)
    -  Slop vessel
    -  Arbitrage–sampling system

Project Afipsky - Loading system for liquid sulphur

Project description
TURN KEY - Project
Following services are included in our scope of the project:

  • Basic engineering
  • Supply of the equipment and devices
    -  1 Top Loading System DN80 for the loading
       of liquid sulphur into tank trucks
    -  Automation systems
    -  Valves, fittings, armatures
    -  Mass flowmeter
    -  Pipelines
    -  Heating systems for fittings, mass flowmeter and pipelines
    -  Ex-barrier
  • Site management / Construction and erection supervision / Commissioning-Start-up
    The construction and erection work started in July 2016.
    Start of operation is expected in 2017.

 

Project Angarsk - Loading and unloading/emptying of liquefied petroleum gas LPG

Project description:
Capacity of the plant:
Unloading/emptying 300.000 tons per year / Loading 100.000 tons per year
Following services are included in our scope of the project:

  • Basic - Engineering
  • Supply of equipment and devices
    -  40 Top Loading-systems for loading and
       unloading of LPG into / out of rail tank wagons
    -  2 screw-type compressors
    -  2 evaporators
    -  2 super heaters
    -  Automation (Yokogawa)
    -  Valves, fittings, armatures
    -  Supply of the EMC / I&C technique
    -  Gas warning/alert system
    -  Communication technique/-facilities
    -  Switch - and control gear
  • Site management / Construction supervision / Commissioning-Start-up