CCP lockage

30.06.2016

Maintenance and repair work on the cathodic corrosion protection (CCP) plants of the barrage in Rehlingen, Mettlach and Kanzem for Waterways and Shipping Office Saarbrücken

Maintenance and repait work on the CCP plants of the barrage in Rehlingen, Mettlach and Kanzem for Waterways and Shipping Office Saarbrücken

Within the framework of checking of CCP plants at the watergates on the upstream and downstream end of a lock following works were carried out by the IGATEC:

  • Potential, current and resistance measurements
  • Logging of the defects and determining measures 
    to protect the floodgates
  • Supply and installation of anodes, electrodes, protective baskets, filter pipes, cables
    and the necessary mounts in the watergate
  • Error correction and re-commissioning of the CCP plants as well as
    re-measurement to test the effectiveness of the CCP protection

After completion of works the lockage is back in operation since the end of June.